Wellbrooke of Avon
Avon, Indiana
A 66,789 SF single-story assisted living facility with many amenities for residents including an ice cream parlor, hair salon, theatre and garden rooms.
Avon, Indiana
A 66,789 SF single-story assisted living facility with many amenities for residents including an ice cream parlor, hair salon, theatre and garden rooms.
Terre Haute, Indiana
A 68,500 SF two-story skilled nursing and assisted living facility. This facility features a physical therapy room for residents to work on their mobility with physical therapists.
Indianapolis, Indiana
10,000 SF two-story bank located in the heart of downtown Indianapolis. The first floor houses the main banking functions and the second floor houses the staff amenities including a breakroom and kitchen.
Carmel, Indiana
A 16,400 SF new facility that features an indoor, climate controlled shooting lanes specially designed for safety and comfort, classrooms and retail space.
Fishers, Indiana
24,000 SF addition to the existing 33,000 SF gymnastics center that features a 6,000 SF mezzanine. The school serves over 300 competitive gymnasts and cheerleaders and nearly 1,000 students in recreation classes.
Carmel, Indiana
New 32,700 SF childcare center featuring specialized classrooms including a cutting-edge science center, a planetarium, a multimedia room, a bowling alley, a kitchen, an expansive library, and an art studio.
Fishers, Indiana
An award-winning, 42,000 SF two-story building that is home to Meyer Najem Construction. The building was designed using locally manufactured and harvested materials and includes a public art display in the second floor atrium, an indoor bike storage facility, and an outdoor patio that backs up to pedestrian/bike trails.
Kuehne & Nagel II, Plainfield, Indiana
This project is a 100,047 SF tenant finish of a warehouse building as well as a renovation of a small office area, which included five offices, eight workstations, a break room and boardroom.
Brownsburg, Indiana
Lincoln Elementary was in need of a new elementary school to accommodate for the increasing number of incoming students to the thriving Brownsburg community. The challenge was to build a new, ground-up structure adjacent to the current building, all while normal school hours and operations took place. Preparations were needed to be sure that school students and faculty were not harmed or interrupted throughout the process.
New Palestine, Indiana
Built to take advantage of natural light, the 15,000-square foot, single story library doubles the size of the areas original building.