City of Fishers, Nickel Plate Trail and 116th Tunnel
The Nickel Plate rail corridor ran through the middle of Fishers for a century. It now carries people instead of freight, on foot and by bike, through the center of downtown and eventually all the way from Noblesville to Indianapolis.
The trail is built to be enjoyed and connect the community. Two tunnels carry it under and through the busiest part of downtown, and where the ground drops more than 15 feet, planted terraces step down alongside instead of a bare wall. There are gathering plazas, a small performance space at trail level, a turf play area, and a set of custom swings hung from the corridor’s original rail depot structure, including one that seats two people facing each other. Since the trail opened, more than $250 million has gone into development along it.
Meyer Najem Advantage:
- Delivery under Indiana’s Build-Operate-Transfer statute across three phases, with Meyer Najem as the accountable CM throughout
- A Duke Energy easement running the full corridor limited permanent structures, plantings, irrigation, and hardscape, and every element was placed to comply without the finished trail showing it
- More than 15 feet of grade change at the 116th Street tunnel absorbed by terraced planting beds rather than a single retaining wall
- The corridor’s original rail depot structure preserved and adapted to carry the urban swings
- Trail construction sequenced through an active downtown with commercial development on both sides
Location:
Fishers, IN
Architect:
Browning Day
Partners:
WB Development Partners
Size:
1.25 Miles